HR Trademark
HR is a USPTO trademark filed by H&R Construction Parts & Equipment, Inc.. Status: Pending.
Trademark Facts
| Mark | HR |
|---|---|
| Serial Number | 99333774 |
| Status | Pending |
| Filing Date | 2025-08-12 |
| Mark Type | Combined |
| Nice Classes | 007 (Machinery), 012 (Vehicles), 035 (Advertising & Business) |
| Owner | H&R Construction Parts & Equipment, Inc. |
| Attorney of Record | Courtney Thompson |
| Prosecution Events | 18 |
| Latest Event | CNSA on 2026-04-23 |
Goods & Services
Class 007: Construction equipment and replacement parts for construction equipment, namely, hydraulic excavators, loader backhoes, motor graders, wheel loaders, motor scrapers, hydraulic cranes, skid steer loaders, telehandlers, aerial lifting work platforms, trencher machines, compact crawler- tracked loaders, feller bunchers, harvesters, log loaders, delimbers, compact track loaders, crawler-tracked loaders, bulldozers, crawler pipelayers, mini excavators, midi excavators, crawler carriers, wheeled excavators; Radiators for motors and engines for articulated trucks, off highway trucks, crawler tractors, and wheeled tractors; Class 012: Components for articulated trucks, off highway trucks, crawler tractors, and wheeled tractors, namely, transmissions, land vehicle engines, engine cylinders for land vehicles, main hydraulic pumps, final drives being gearboxes for land vehicles, track spring assemblies, differentials, torque converters for land vehicles, oil coolers, brake groups, axles for land vehicles, cabs, suspension drop boxes, and vehicle brake control valves; all of the foregoing excluding components for passenger automobiles and light duty trucks; Class 035: Online retail store services and retail store services featuring agricultural, construction, and industrial equipment and parts
Recent Prosecution Activity
| Date | Document | Type |
|---|---|---|
| 2026-04-23 | TRAM Snapshot of App at Pub for Oppostn | PST |
| 2026-04-07 | Amendment and Mail Process Complete | AMC |
| 2026-04-06 | TEAS Request Reconsideration after FOA | RFR |
| 2026-04-06 | Specimen | SPE |
| 2026-04-03 | Final Action | FREF |
| 2026-02-27 | Amendment and Mail Process Complete | AMC |
USPTO Refusals on Record
- indefinite_identification
- multiple_class_application
- unacceptable_specimen