Never miss important updates for PROJECT SUCCESS INCORPORATED HOW TEAMS TRIUMPH PSM PROJECT SUCCESS METHOD DEFINE · PLAN · CONTROL
Get alerts when status changes, similar marks are filed, or renewal deadlines approach
Get alerts when status changes, similar marks are filed, or renewal deadlines approach
Serial Number
Registration Number
Not Registered
Status
New Application – Record Initialized Not Assigned to Examiner
Address
First Use Date
Not filed yet
Filing Date
Aug 14, 2026
Publication Date
Not published yet
Goods
The mark consists of the design of a six-sided badge comprising a thick outer outline and a thin inner outline, with a stylized ribbon design extending across the middle of the badge and containing the stylized wording "PSM" above the stylized wording "PROJECT SUCCESS METHOD" between two dashes. Above the ribbon design is a design comprising a shaded horizontal rectangle, below which are two shaded squares positioned side by side. The rectangle is formed by a lighter shaded triangle in the upper right corner and a darker shaded quadrilateral forming the remainder of the rectangle. The bottom right square is formed by a lighter shaded triangle and a darker shaded triangle. To the right of the design is the stylized wording "PROJECT SUCCESS INCORPORATED" appearing on separate lines. Underneath the design and wording is the stylized wording "HOW TEAMS TRIUMPH." Below the ribbon design is a longer horizontal line above the stylized wording "DEFINE," "PLAN," and "CONTROL," with a shorter horizontal line below the wording. One bullet point appears between the terms "DEFINE" and "PLAN," and one bullet point appears between the terms "PLAN" and "CONTROL.".
"PROJECT" AND "INCORPORATED"
How often are these words disclaimed?
PROJECT SUCCESS INCORPORATED HOW TEAMS TRIUMPH PSM PROJECT SUCCESS METHOD DEFINE PLAN CONTROL · PROJECT SUCCESS INCORPORATED HOW TEAMS TRIUMPH PROJECT SUCCESS METHOD PROJECT SUCCESS METHOD DEFINE PLAN CONTROL
No documents found for this trademark.